Reassembly progress

Made a = little progress since the car body arrived home on monday afterno= on.
=  
Wiring = loom has been fitted roughly.  The hard bit was getting the rear loom = through a small channel in the A pillar.  I did have a piece of g= uide rope left in this area however it has seemed to disappeared at some stage along the project. 
=  
The car= is now ready for the roof lining to be fitted over the weekend.
 
The other job I worked on= tonight was reassembling the instrument dash cluster.  Photo attached= ..
 
Have confirmed that I wil= l be taking Grandma and Grandad to Sydney for a hospital visit.  The s= urgery on November 6th is to fix 2 blood clots in Grandad's = brain. 
 
Other bad news today was = that Grandma has a skin cancer under her eye that needs to be removed on De= cember 16.  I have set this as my new goal to have the FC fully ready = in the first week of December, so I can show grandma the car before her surgery.
 
Bye for now.
 

What did you think of this article?




Trackbacks
  • No trackbacks exist for this post.
Comments
  • No comments exist for this post.
Leave a comment

Submitted comments are subject to moderation before being displayed.

 Name

 Email (will not be published)

 Website

Your comment is 0 characters limited to 3000 characters.